Changes to this Step
Edit by Florian Daeubler —
Edit approved by Florian Daeubler
- Before
- After
- Unchanged
Step Lines
[title] Case Mounting V | |
- | [* 5] The |
- | [* 3] The |
- | [* 4] Both the |
+ | [* 5] The extruder wire bundle will be entering the case on the ***top left*** opening. |
+ | [* 3] The heated bed wire bundle will be entering the case on the ***bottom left*** opening. |
+ | [* 4] Both the extruder wire bundle and the heated bed wire bundle will be secured with the ***''cable_clip_extruder''*** and the ***''cable_clip_bed''*** (picture 2). |
[* 7] Secure both cable clips with 4x ***M3x10mm*** screws (picture 3). | |
- | [* 8] The |
- | [* 2] The |
+ | [* 8] The X-axis motor wire will be entering the case on the ***top right*** opening. |
+ | [* 2] The X-axis motor wire will be fixed with a ***zip tie*** (picture 2). |