Skip to main content

Changes to this Step

Edit by Florian Daeubler

Edit approved by Florian Daeubler

Before
After
Unchanged

Step Lines

[title] Case Mounting V
-[* 5] The ***extruder wire bundle*** will be entering the case on the ***top left*** opening.
-[* 3] The ***heated bed wire bundle*** will be entering the case on the ***bottom left*** opening.
- [* 4] Both the ***extruder wire bundle*** and the ***heated bed wire bundle*** will be secured with the ***''cable_clip_extruder''*** and the ***''cable_clip_bed''*** (picture 2).
+[* 5] The extruder wire bundle will be entering the case on the ***top left*** opening.
+[* 3] The heated bed wire bundle will be entering the case on the ***bottom left*** opening.
+ [* 4] Both the extruder wire bundle and the heated bed wire bundle will be secured with the ***''cable_clip_extruder''*** and the ***''cable_clip_bed''*** (picture 2).
[* 7] Secure both cable clips with 4x ***M3x10mm*** screws (picture 3).
-[* 8] The ***X-axis motor wire*** will be entering the case on the ***top right*** opening.
- [* 2] The ***X-axis motor wire*** will be fixed with a ***zip tie*** (picture 2).
+[* 8] The X-axis motor wire will be entering the case on the ***top right*** opening.
+ [* 2] The X-axis motor wire will be fixed with a ***zip tie*** (picture 2).