Skip to main content

Changes to this Step

Edit by Florian Daeubler

Edit approved by Florian Daeubler

Before
After
Unchanged

Step Lines

-[title] Case Mounting V
+[title] Case Mounting IV
[* 5] The extruder wire bundle will be entering the case on the ***top left*** opening.
[* 3] The heated bed wire bundle will be entering the case on the ***bottom left*** opening.
[* 4] Both the extruder wire bundle and the heated bed wire bundle will be secured with the ***''cable_clip_extruder''*** and the ***''cable_clip_bed''*** (picture 2).
[* 7] Secure both cable clips with 4x ***M3x10mm*** screws (picture 3).
[* 8] The X-axis motor wire will be entering the case on the ***top right*** opening.
[* 2] The X-axis motor wire will be fixed with a ***zip tie*** (picture 2).