Changes to this Step
Edit by Florian Daeubler —
Edit approved by Florian Daeubler
- Before
- After
- Unchanged
Step Lines
- | [title] |
---|---|
+ | [title] Wire Management |
[* 5] The extruder wire bundle will be entering the case on the top left opening. | |
[* 3] The heated bed wire bundle will be entering the case on the bottom left opening. | |
[* 4] Both the extruder wire bundle and the heated bed wire bundle will be secured with the ***''board_cable_clamp_extruder''*** and the ***''board_cable_clamp_bed''*** (picture 2). | |
[* 4] Secure both cable clips with 4x ***M3x10mm*** screws (picture 3). | |
[* 8] The X-axis motor wire will be entering the case on the top right opening. | |
- | [* 8] The X-axis motor wire will be fixed with a ***zip tie*** (picture |
+ | [* 8] The X-axis motor wire will be fixed with a ***zip tie*** (picture 3). |