Changes to Step #1
Edit by Florian Daeubler —
Edit approved by Florian Daeubler
- Before
- After
- Unchanged
Step Lines
[title] Preparation | |
[* 5] Insert 3x ***M3 square nuts*** in ***''duet_cover_back''***. | |
[* 3] Insert one more ***M3 square nut*** on the inside of the case. | |
[* 9] Make sure to fully insert the nuts! | |
- | [* 8] Remove both |
+ | [* 8] Remove both printed supports from the tabs on ***''duet_cover_lid''***. |