Changes to Step #5
Edit by Grégoire Saunier —
Edit approved by Grégoire Saunier
- Before
- After
- Unchanged
Step Lines
+ | [* 5] Insert two M3 square nuts on top front of stepper |
---|---|
+ | [* 7] Insert two M3 square nuts in vertical on the back of the stepper |
+ | [* 2] Verify you do not have M3 square nuts in those holes |
Image 1
No previous image
Added
Image 2
No previous image
Added