Skip to main content

Changes to Step #5

Edit by Grégoire Saunier

Edit approved by Grégoire Saunier

Before
After
Unchanged

Step Lines

+[title] X smooth rods tension
+[* 5] Grip the X motor shaft with pliers to prevent it moving (grab the flat side of the shaft). Tension the belt, by tightening the screws in the ''x_end_idler''. Do this while trying to move the extruder to the left or right. The belt should stay straight and should not bow up and skip over the drive pulley teeth.
+[* 6] Thread two M3x10 screws in the ''x_end_idler''. Don't tighten them fully yet, it will be done on the next step.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added