Skip to main content

Changes to Step #6

Edit by Dave Ogles

Edit approved by Grégoire Saunier

Before
After
Unchanged

Step Lines

[title] Prepare Y bearings
-[* 10] We are not going to prepare few parts that will be used later in this chapter. Let's start with the Y bearing holders.
+[* 10] We are now going to prepare a few parts that will be used later in this chapter. Let's start with the Y bearing holders.
[* 3] Take the 3x ''y_bearing_holder'' and insert 2x locknuts in each of them (6x locknuts in total).
-[* 5] We need to make sure that the locknut are fully inserted in their pocket. For doing this, take 1x M3x18 screws and 1x washer.
- [* 7] In every holes of the ''y_belt_holders'', insert and tighten the screw with the washer to ensure the locknut is fully inserted in its pocket.
-[* 9] Verify that the 6x locknut are correctly fully inserted.
+[* 5] We need to make sure that the locknuts are fully inserted in their pocket. To do this, take 1x M3x18 screw and 1x washer.
+ [* 7] For each locknut in the ''y_belt_holders'', insert the screw and tighten it against the washer, until the locknut is fully seated.
+[* 9] Check that the 6x locknuts are fully seated in the bearing holders.