Changes to Step #14
Edit by Grégoire Saunier —
Edit approved by Grégoire Saunier
- Before
- After
- Unchanged
Step Lines
+ | [title] LCD and left Z motor wiring |
---|---|
[* 10] Pictures needs to be redo with correct Z motors | |
[* 5] Create a twisted loop with the LCD cables under the front of the frame. | |
[* 7] Clip the LCD cables in the ''cable_clip_lcd''. | |
[* 8] Place the Z stepper cable on the ''cable_clip_vertical''. | |
[* 4] Attach LCD cables and Z motor cable to the ''cable_clip_vertical'' using a zip tie. |