Skip to main content

Changes to Step #21

Edit by Dave Ogles

Edit approved by Grégoire Saunier

Before
After
Unchanged

Step Lines

-[title] Back cables routing - MK2(S)/MK2.5(S)
+[title] Rear cable routing - MK2(S)/MK2.5(S)
[* 9] Do not over-tighten the zip ties as you might damage the wires.
-[* 7] You can now improve the placements of the cables running along the back of the frame and fully tighten the zip ties.
-[* 5] With a zip tie, attach all the cables, including the LCD cables and the left Z motor (from the electronic cover).
+[* 7] You can now improve the placements of the cables running along the back of the frame and carefully tighten the zip ties.
+[* 5] With a zip tie, bundle all the cables, including the LCD cables and the left Z motor (from the electronic cover), together.