Skip to main content

Changes to Step #5

Edit by Grégoire Saunier

Edit approved by Grégoire Saunier

Before
After
Unchanged

Step Lines

+[title] Attach the X belt
+[* 7] Route the timing belt through the x_carriage.
+[* 5] Continue to route the timing belt around the idler of the ''x_end_ilder_idler_mount'' and go back in the direction of the ''x_carriage''.
+[* 3] To finish routing the timing belt, attach few belt teeth in the ''x_carriage''.
+[* 10] The belt should have almost no tension, it will be adjusted later.
+[* 6] Estimate the length and cut the belt. Finish to insert it in the ''x_carriage''
+[* 9] Verify that the belt is completely pressed into the slot and that it extends to the central portion.
+[* 9] Verify that no cable is pinched by the belt.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added